Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 24, 2021, 04:53 AM
  • 02 0994A_02 0994_03232021_220947.mp4

  • 02 0995_02 0994A_03232021_220148.mp4

Date
03/23/2021
W/O
880108
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00279
PipeID
P03568
Time
9:53 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8801
Sewer Name
02 MONTEBELLO TRUNK
City
COMMERCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_880108_TV02387_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
15 in.
Upstream MH
02 0995
Downstream MH
02 0994A
Dir. of Survey
Downstream
Length Surveyed
43.1 ft.
Total Length
43.1 ft.
Structural Index
3
Structural Quick
4138
Structural Rating
28
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
28
Pipe schematic from manhole 02 0995 to 02 0994A
MH: 02 0995MH: 02 0994Adownstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 02 09950 ft. MWM - Water Mark, 35 %of cross sectional area4.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish37.3 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES40.1 ft. FS - Fracture Spiral, from 03 to 09 o'clock, within 8 inches of joint: YES43.1 ft. AMH - Downstream Manhole, Survey Ends - 02 0994A43.1 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    37.3 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 03 to 09 o'clock, within 8 inches of joint: YES

    40.1 ft. - Fracture Spiral, from 03 to 09 o'clock, within 8 inches of joint: YES

Observations (10)

DistanceCodeObservation
4.1CM
0MWL
0MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
0AMH02 0995
43.1AMH02 0994A
0MWM
37.3FM
37.2CM
43.1MGOCONNECTION AT MH, 3 O'CLOCK
40.1FS

Properties (6)

custom_field_three
CRACKS, FRACTURES
custom_field_two
3
customer
1
datetime
2021-03-23T21:53:33-07:00
documentation
PRO PIPE
is_lateral_inspection
false