Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 25, 2021, 06:04 AM
  • 15 1101_15 1100_03242021_232751.mp4

Date
03/24/2021
W/O
885750
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00614
PipeID
P12861
Time
11:04 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8805
Sewer Name
15 MERCED TRUNK, SECTION 1
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
RFIR_WO_885750_TV15098_APR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
15 1101
Downstream MH
15 1100
Dir. of Survey
Downstream
Length Surveyed
329.7 ft.
Total Length
329.7 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
2
O&M Quick
2U00
O&M Rating
224
Overall Index
2
Overall Quick
Overall Rating
232
Pipe schematic from manhole 15 1101 to 15 1100
MH: 15 1101MH: 15 1100downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 11010 ft. MWL - Water Level, 15 %of cross sectional area2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start51.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"90.6 ft. OBR - Obstacles Rocks, 5 %of cross sectional area, at 06 o'clock, Start112.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"113.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES231.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"320.5 ft. MMC - Material Change, Cast Iron320.5 ft. OBR - Obstacles Rocks, 5 %of cross sectional area, at 06 o'clock, Finish320.5 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start329.6 ft. OBZ - Obstacles Other, 10 %of cross sectional area, at 06 o'clock - UNDER FLOW329.7 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.7 ft. AMH - Downstream Manhole, Survey Ends - 15 1100329.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Obstacles Rocks, 5 %of cross sectional area, at 06 o'clock, Start

    90.6 ft. - Obstacles Rocks, 5 %of cross sectional area, at 06 o'clock, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    113.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Material Change, Cast Iron

    320.5 ft. - Material Change, Cast Iron

  • Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    320.5 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Other, 10 %of cross sectional area, at 06 o'clock - UNDER FLOW

    329.6 ft. - Obstacles Other, 10 %of cross sectional area, at 06 o'clock - UNDER FLOW

Observations (16)

DistanceCodeObservation
329.7SCP
2.2DAGS
113.5SSS
0MWM
90.6OBR
320.5MMC
51.2TF
320.5OBR
231.6TF
112.5TF
329.6OBZUNDER FLOW
0AMH15 1101
320.5SCP
329.7AMH15 1100
0MWL
329.7DAGS

Properties (6)

custom_field_three
ROCKS, CAST IRON CORROSION
custom_field_two
3
customer
1
datetime
2021-03-24T23:04:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false