15 0899_15 0898_03252021_012735.mp4
8.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
16.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
16.5 ft. - Material Change, Vitrified clay pipe
49.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
49.4 ft. - Material Change, Concrete pipe (non-reinfored)
66.9 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES
66.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
72.8 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES
73.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
84.8 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
355.6 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 355.6 | RFJ | — |
| 66.9 | RFJ | — |
| 8.4 | SAP | — |
| 410 | SAP | — |
| 73.1 | FM | — |
| 49.4 | SAP | — |
| 238.7 | RFJ | — |
| 49.4 | MMC | — |
| 84.8 | RFJ | — |
| 410 | DAGS | — |
| 411.5 | MGO | CONNECTION AT MH, 9 O'CLOCK |
| 411.5 | AMH | 15 0898 |
| 16.5 | DAGS | — |
| 0 | MWL | — |
| 66.9 | FM | — |
| 72.8 | RFJ | — |
| 410 | FM | — |
| 391.3 | RFJ | — |
| 0 | MWM | — |
| 16.5 | MMC | — |
| 0 | AMH | 15 0899 |
| 0 | MGO | CONNECTION AT MH, 9 O'CLOCK |
| 16.5 | SAP | — |