Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 25, 2021, 08:51 AM
  • 15 0897_15 0896_03252021_020623.mp4

Date
03/25/2021
W/O
885860
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00599
PipeID
P12691
Time
1:51 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8806
Sewer Name
15 CALIFORNIA AVENUE TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_885860_TV15182_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0897
Downstream MH
15 0896
Dir. of Survey
Downstream
Length Surveyed
299.1 ft.
Total Length
299.1 ft.
Structural Index
3
Structural Quick
4J3K
Structural Rating
404
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
404
Pipe schematic from manhole 15 0897 to 15 0896
MH: 15 0897MH: 15 0896downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 08972.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.1 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES14.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start296.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish296.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish299.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0896299.1 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES

    9.1 ft. - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWM
0MWL
299.1AMH15 0896
2.1SAP
9.1FL
14.8FM
299.1MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
0AMH15 0897
296.3SAP
296.3FM

Properties (6)

custom_field_three
FRACTURES, AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-03-25T01:51:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false