Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2021, 06:26 AM
  • 15 0885_15 0884_03252021_233828.mp4

Date
03/25/2021
W/O
885860
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00599
PipeID
P12678
Time
11:26 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8807
Sewer Name
15 CALIFORNIA AVENUE TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_885860_TV15182_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0885
Downstream MH
15 0884
Dir. of Survey
Downstream
Length Surveyed
317.6 ft.
Total Length
317.6 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
310
Pipe schematic from manhole 15 0885 to 15 0884
MH: 15 0885MH: 15 0884downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 08850 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area3 ft. MGO - General Observation - MAG COAT3.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start163.2 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 10"315.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish315.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0884

Observation photos (4)

  • General Observation - MAG COAT

    3 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 10"

    163.2 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 10"

Observations (10)

DistanceCodeObservation
0AMH15 0885
3.1SSS
163.2TBA
317.6AMH15 0884
315.3SSS
0MWM
315.4SAP
3MGOMAG COAT
0MWL
3.1SAP

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-03-25T23:26:07-07:00
documentation
PRO PIPE
is_lateral_inspection
false