Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2021, 07:36 AM
  • 15 0883_15 0882_03262021_005203.mp4

Date
03/26/2021
W/O
885860
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00599
PipeID
P12676
Time
12:36 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8807
Sewer Name
15 CALIFORNIA AVENUE TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_885860_TV15182_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0882
Downstream MH
15 0883
Dir. of Survey
Upstream
Length Surveyed
300.3 ft.
Total Length
300.3 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
295
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
295
Pipe schematic from manhole 15 0882 to 15 0883
MH: 15 0882MH: 15 0883upstream0 ft. AMH - Upstream Manhole, Survey Ends - 15 08830 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK1.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish60 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"66.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"130.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"145.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"181.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"220.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"240.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"298.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start298.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start298.3 ft. MGO - General Observation - MAG COAT300.3 ft. AMH - Downstream Manhole, Survey Begins - 15 0882300.3 ft. MWL - Water Level, 15 %of cross sectional area300.3 ft. MWM - Water Mark, 35 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

Observations (17)

DistanceCodeObservation
0AMH15 0882
59.5TFC
0MWL
299.1SSS
300.3AMH15 0883
234.2TFC
80TFC
170.2TFC
0MWM
2SAP
240.3TF
2SSS
155.1TFC
119.2TFC
2MGOMAG COAT
299.1SAP
300.3MGOCONNECTION AT MH, 9 O'CLOCK

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-03-26T00:36:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false