Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2021, 08:41 AM
  • 15 0880_15 0879_03262021_015537.mp4

Date
03/26/2021
W/O
885860
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00599
PipeID
P12673
Time
1:41 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8807
Sewer Name
15 CALIFORNIA AVENUE TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_885860_TV15182_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0880
Downstream MH
15 0879
Dir. of Survey
Downstream
Length Surveyed
279 ft.
Total Length
279 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
270
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
270
Pipe schematic from manhole 15 0880 to 15 0879
MH: 15 0880MH: 15 0879downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 08800 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK CAPPED0 ft. MWL - Water Level, 10 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT5.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"53.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"105.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"108.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"166.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"169.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"196.8 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"226.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"229.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"269.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"272.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"277.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish277.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish278.9 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK279 ft. AMH - Downstream Manhole, Survey Ends - 15 0879

Observation photos (3)

  • General Observation - MAG COAT

    2.1 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
169.2TFC
2.1MGOMAG COAT
35.5TFC
5.4SSS
166.2TFC
278.9MGOCONNECTION AT MH, 9 O'CLOCK
269.4TFC
272.7TFC
105.5TFC
277.1SSS
196.8TFA
0AMH15 0880
0MWM
226.7TFC
229.9TFC
279AMH15 0879
108.5TF
53.9TF
5.4SAP
0MGOCONNECTION AT MH, 3 AND 9 O'CLOCK CAPPED
0MWL
277.1SAP

Properties (6)

custom_field_three
SPALLING, AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-03-26T01:41:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false