Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2021, 08:56 AM
  • 15 0879_15 0878_03262021_020210.mp4

Date
03/26/2021
W/O
885860
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00599
PipeID
P12672
Time
1:56 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8807
Sewer Name
15 CALIFORNIA AVENUE TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_885860_TV15182_APR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0879
Downstream MH
15 0878
Dir. of Survey
Downstream
Length Surveyed
81.2 ft.
Total Length
81.2 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
74
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
74
Pipe schematic from manhole 15 0879 to 15 0878
MH: 15 0879MH: 15 0878downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK CAPPED0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 08792.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.4 ft. MGO - General Observation - MAG COAT15 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start80.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish80.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish80.3 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK81.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0878

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    5.4 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    15 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
80.3MGOCONNECTION AT MH, 9 O'CLOCK
0MGOCONNECTION AT MH 9 OCLOCK CAPPED
0MWL
80.1SSS
15SSS
5.4MGOMAG COAT
0MWM
81.2AMH15 0878
0AMH15 0879
80.1SAP
2.2SAP

Properties (6)

custom_field_three
SPALLING, AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-03-26T01:56:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false