Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 16, 2021, 05:09 AM
  • 20 0069_20 0068_03152021_222908.mp4

Date
03/15/2021
W/O
880302
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00742
PipeID
P18990
Time
10:09 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8600
Sewer Name
20 TRUNK "A"
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_880302_TV20023_MAR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
20 0069
Downstream MH
20 0068
Dir. of Survey
Downstream
Length Surveyed
386.9 ft.
Total Length
386.9 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
365
O&M Index
3
O&M Quick
3N00
O&M Rating
219
Overall Index
3
Overall Quick
Overall Rating
584
Pipe schematic from manhole 20 0069 to 20 0068
MH: 20 0069MH: 20 0068downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 00692 ft. MGO - General Observation - MAG COATING THROUGHOUT21 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.2 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS/SLUDGE48.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"96.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"196.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"245.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"298.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"346.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"386.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish386.9 ft. AMH - Downstream Manhole, Survey Ends - 20 0068386.9 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish386.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    21 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    21 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  20 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS/SLUDGE

    24.2 ft. - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS/SLUDGE

Observations (17)

DistanceCodeObservation
386.9SSS
245.7TFC
96.2TFC
196.9TFC
0MWL
386.9AMH20 0068
148.8TFC
298.4TFC
346.3TFC
21SSS
21SAP
24.2DSZDEBRIS/SLUDGE
2MGOMAG COATING THROUGHOUT
48.1TFC
386.9DSZ
386.9SAP
0AMH20 0069

Properties (7)

additional_info
630069031521201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-03-15T22:09:18-07:00
documentation
PRO PIPE
is_lateral_inspection
false