Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 16, 2021, 08:03 AM
  • 20 0050_20 0049_03162021_011715.mp4

Date
03/16/2021
W/O
880302
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00742
PipeID
P18971
Time
1:03 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8600
Sewer Name
20 TRUNK "A"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_880302_TV20023_MAR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
20 0050
Downstream MH
20 0049
Dir. of Survey
Downstream
Length Surveyed
352.4 ft.
Total Length
352.4 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
350
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
350
Pipe schematic from manhole 20 0050 to 20 0049
MH: 20 0050MH: 20 0049downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 00500 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start23.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"71.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"119.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"224.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"321.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"350.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish350.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish352.4 ft. AMH - Downstream Manhole, Survey Ends - 20 0049

Observation photos (3)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
350.1SAP
321.3TFC
23.2TFC
2MGOMAG COATING THROUGHOUT
350.1SSS
0AMH20 0050
0MWM
0MWL
352.4AMH20 0049
224.5TFC
2SAP
71.7TFC
2SSS
119.7TFC

Properties (7)

additional_info
630069031521201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-03-16T01:03:28-07:00
documentation
PRO PIPE
is_lateral_inspection
false