Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2021, 06:24 AM
  • 15 0212_15 0211_03102021_234832.mp4

Date
03/10/2021
W/O
880319
Weather
Damp
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00620
PipeID
P12134
Time
10:24 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8633
Sewer Name
15 PECK ROAD TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Routine Assessment
Project
WO_880319_TV15022_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0212
Downstream MH
15 0211
Dir. of Survey
Downstream
Length Surveyed
291.7 ft.
Total Length
291.7 ft.
Structural Index
3
Structural Quick
4131
Structural Rating
13
O&M Index
2
O&M Quick
412I
O&M Rating
101
Overall Index
2
Overall Quick
Overall Rating
114
Pipe schematic from manhole 15 0212 to 15 0211
MH: 15 0212MH: 15 0211downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02122 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start15.3 ft. RFJ - Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YES15.3 ft. CS - Crack Spiral, from 04 to 09 o'clock, within 8 inches of joint: YES25.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"100.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"131.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"168.3 ft. FM - Fracture Multiple, from 07 to 12 o'clock, within 8 inches of joint: YES173.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"181.6 ft. CS - Crack Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES241 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start241 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish267.5 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish280.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES291.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0211291.7 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 04 to 09 o'clock, within 8 inches of joint: YES

    15.3 ft. - Crack Spiral, from 04 to 09 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 12 o'clock, within 8 inches of joint: YES

    168.3 ft. - Fracture Multiple, from 07 to 12 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

    181.6 ft. - Crack Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    241 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    280.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (18)

DistanceCodeObservation
131.1TFC
168.3FM
15.3RFJ
2DAGS
25.2TFC
267.5MWLS
0MWL
15.3CS
241MWLS
0MWM
291.7AMH15 0211
280.7CM
0AMH15 0212
291.7MGOCONNECTION AT MH, 9 O'CLOCK
181.6CS
100.9TF
173.6TF
241DAGS

Properties (6)

custom_field_three
CRACKS, FRACTURES
custom_field_two
3
customer
1
datetime
2021-03-10T22:24:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false