Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2021, 08:46 AM
  • 15 0205_15 0204_03112021_020129.mp4

Date
03/11/2021
W/O
880319
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00620
PipeID
P12127
Time
12:46 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8633
Sewer Name
15 PECK ROAD TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Routine Assessment
Project
WO_880319_TV15022_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0205
Downstream MH
15 0204
Dir. of Survey
Downstream
Length Surveyed
250.7 ft.
Total Length
250.7 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
108
O&M Index
2
O&M Quick
2I00
O&M Rating
98
Overall Index
2
Overall Quick
Overall Rating
206
Pipe schematic from manhole 15 0205 to 15 0204
MH: 15 0205MH: 15 0204downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 02050 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"17.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"23.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES53.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"68.3 ft. CM - Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES69.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"76.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start147.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"168.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"213.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"247.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish247.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish250.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0204

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    23.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

    68.3 ft. - Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    76.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
68.3CM
147.5TFC
0AMH15 0205
247.9CM
213.2TF
250.7AMH15 0204
6.7TF
53.7TFC
17.1TFC
76.5CM
247.9DAGS
168.1TFC
0MWL
0MWM
2.3DAGS
69.9TF
23.7CM

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-11T00:46:23-08:00
documentation
PRO PIPE
is_lateral_inspection
false