Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2021, 09:02 AM
  • 15 0204_15 0203_03112021_021709.mp4

Date
03/11/2021
W/O
880319
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00620
PipeID
P12126
Time
1:02 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8633
Sewer Name
15 PECK ROAD TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Routine Assessment
Project
WO_880319_TV15022_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0204
Downstream MH
15 0203
Dir. of Survey
Downstream
Length Surveyed
243.8 ft.
Total Length
243.8 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
108
O&M Index
2
O&M Quick
412I
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
208
Pipe schematic from manhole 15 0204 to 15 0203
MH: 15 0204MH: 15 0203downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02040 ft. MWM - Water Mark, 50 %of cross sectional area2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start21.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"61 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start95.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"173.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"240.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish240.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish243.7 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK243.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0203

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    61 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
243.8AMH15 0203
95.6TFC
21.6TF
173.3TF
0MWL
243.7MGOCONNECTION AT MH, 9 O'CLOCK
0AMH15 0204
61CM
240.7CM
0MWM
2.1DAGS
240.7DAGS

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-11T01:02:56-08:00
documentation
PRO PIPE
is_lateral_inspection
false