Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2021, 11:04 AM
  • 15 0202_15 0201_03112021_041724.mp4

Date
03/11/2021
W/O
880319
Weather
Heavy Rain
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00620
PipeID
P12124
Time
3:04 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8633
Sewer Name
15 PECK ROAD TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Routine Assessment
Project
WO_880319_TV15022_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0202
Downstream MH
15 0201
Dir. of Survey
Downstream
Length Surveyed
233.4 ft.
Total Length
233.4 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
120
O&M Index
2
O&M Quick
2H00
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
212
Pipe schematic from manhole 15 0202 to 15 0201
MH: 15 0202MH: 15 0201downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02020 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES16.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start34.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"47.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"96.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"129.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"209.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish229.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish233.3 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK233.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0201

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    8.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    16.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2DAGS
0MWM
233.3MGOCONNECTION AT MH, 9 O'CLOCK
96.2TFC
0AMH15 0202
0MWL
233.4AMH15 0201
229.9DAGS
34.9TF
209.2CM
129.1TFC
16.4CM
47.2TF
8.3CM

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-11T03:04:36-08:00
documentation
PRO PIPE
is_lateral_inspection
false