Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 12, 2021, 06:04 AM
  • 15 0199_15 0198_03112021_232244.mp4

Date
03/11/2021
W/O
880319
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00620
PipeID
P12121
Time
10:04 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8634
Sewer Name
15 PECK ROAD TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Routine Assessment
Project
WO_880319_TV15022_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0199
Downstream MH
15 0198
Dir. of Survey
Downstream
Length Surveyed
357.4 ft.
Total Length
357.4 ft.
Structural Index
3
Structural Quick
413K
Structural Rating
192
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
332
Pipe schematic from manhole 15 0199 to 15 0198
MH: 15 0199MH: 15 0198downstream0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 01990 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start10.6 ft. CS - Crack Spiral, from 03 to 04 o'clock, within 8 inches of joint: YES23 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES39.4 ft. CM - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES47.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start65.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"131 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"208.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"249.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"310.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"354.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish354.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish357.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0198

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 03 to 04 o'clock, within 8 inches of joint: YES

    10.6 ft. - Crack Spiral, from 03 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    23 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

    39.4 ft. - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    47.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
65.6TFC
354.3CM
47.5CM
10.6CS
131TF
249.5TF
354.3DAGS
310.9TF
208.7TFC
0MGOCONNECTION AT MH, 9 O'CLOCK
23FM
0MWM
0AMH15 0199
0MWL
39.4CM
357.4AMH15 0198
2DAGS

Properties (6)

custom_field_three
multiple cracks
custom_field_two
3
customer
1
datetime
2021-03-11T22:04:26-08:00
documentation
PRO PIPE
is_lateral_inspection
false