Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 12, 2021, 06:46 AM
  • 15 0197_15 0196_03122021_000739.mp4

Date
03/11/2021
W/O
880319
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00620
PipeID
P12119
Time
10:46 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8634
Sewer Name
15 PECK ROAD TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Routine Assessment
Project
WO_880319_TV15022_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0197
Downstream MH
15 0196
Dir. of Survey
Downstream
Length Surveyed
354.9 ft.
Total Length
354.9 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
204
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
344
Pipe schematic from manhole 15 0197 to 15 0196
MH: 15 0197MH: 15 0196downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 01972.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start15.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES24.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start74.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"144.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"169 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"188.3 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES193.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"247.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"259.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"304.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"351.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish351.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish354.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0196

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    15.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    24.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

    188.3 ft. - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
2.2DAGS
0MWM
304.4TFC
351.9CM
169TFC
247.1TFC
193.8TF
74.8TFC
15.8CM
259.3TF
0MWL
354.9AMH15 0196
351.9DAGS
0AMH15 0197
188.3FS
24.2CM
144.4TF

Properties (6)

custom_field_three
multiple cracks
custom_field_two
3
customer
1
datetime
2021-03-11T22:46:58-08:00
documentation
PRO PIPE
is_lateral_inspection
false