Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 12, 2021, 07:49 AM
  • 15 0196_15 0195_03122021_011256.mp4

Date
03/11/2021
W/O
880319
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00620
PipeID
P12118
Time
11:49 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8634
Sewer Name
15 PECK ROAD TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Routine Assessment
Project
WO_880319_TV15022_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0196
Downstream MH
15 0195
Dir. of Survey
Downstream
Length Surveyed
355.9 ft.
Total Length
355.9 ft.
Structural Index
3
Structural Quick
3L23
Structural Rating
195
O&M Index
2
O&M Quick
312M
O&M Rating
144
Overall Index
2
Overall Quick
Overall Rating
339
Pipe schematic from manhole 15 0196 to 15 0195
MH: 15 0196MH: 15 0195downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 01962.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start10.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"19.6 ft. CS - Crack Spiral, from 08 to 02 o'clock, within 8 inches of joint: YES27.8 ft. CS - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES33.2 ft. CS - Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES35.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"57.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"107.4 ft. RML - Roots Medium Lateral, at 06 o'clock, 10 %, within 8 inches of joint: YES107.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"132.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"155.2 ft. RFJ - Roots Fine Joint, at 08 o'clock, within 8 inches of joint: YES173.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"214.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"239 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"292.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"334 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"352.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish352.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish355.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0195

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 08 to 02 o'clock, within 8 inches of joint: YES

    19.6 ft. - Crack Spiral, from 08 to 02 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

    27.8 ft. - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

    33.2 ft. - Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    35.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Medium Lateral, at 06 o'clock, 10 %, within 8 inches of joint: YES

    107.4 ft. - Roots Medium Lateral, at 06 o'clock, 10 %, within 8 inches of joint: YES

  • Roots Fine Joint, at 08 o'clock, within 8 inches of joint: YES

    155.2 ft. - Roots Fine Joint, at 08 o'clock, within 8 inches of joint: YES

Observations (23)

DistanceCodeObservation
10.2TF
355.9AMH15 0195
132.4TFC
0MWM
37.7TFC
35.8CM
155.2RFJ
0MWL
107.4RML
214.7TFC
292.7TFC
352.8DAGS
27.8CS
352.8CM
173.2TF
334TF
33.2CS
107.4TF
57.8TFC
2.1DAGS
239TF
0AMH15 0196
19.6CS

Properties (6)

custom_field_three
multiple cracks
custom_field_two
3
customer
1
datetime
2021-03-11T23:49:58-08:00
documentation
PRO PIPE
is_lateral_inspection
false