Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 12, 2021, 09:52 AM
  • 15 0193_15 0192_03122021_031103.mp4

Date
03/12/2021
W/O
880319
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00620
PipeID
P12115
Time
1:52 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8634
Sewer Name
15 PECK ROAD TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
17
Purpose
Routine Assessment
Project
WO_880319_TV15022_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0193
Downstream MH
15 0192
Dir. of Survey
Downstream
Length Surveyed
343.8 ft.
Total Length
343.8 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
195
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
333
Pipe schematic from manhole 15 0193 to 15 0192
MH: 15 0193MH: 15 0192downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 01930.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start14.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES27.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start78.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"155.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"178 ft. FS - Fracture Spiral, from 04 to 08 o'clock, within 8 inches of joint: YES221.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"245.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"342.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish342.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish343.7 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK343.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0192

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    14.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    27.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 04 to 08 o'clock, within 8 inches of joint: YES

    178 ft. - Fracture Spiral, from 04 to 08 o'clock, within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
343.7MGOCONNECTION AT MH, 9 O'CLOCK
78.1TFA
221.1TF
0.1DAGS
27.4CM
178FS
343.8AMH15 0192
0MWM
342.9CM
155.7TF
245.9TFC
0MWL
0AMH15 0193
14.7CM
342.9DAGS

Properties (6)

custom_field_three
multiple cracks
custom_field_two
3
customer
1
datetime
2021-03-12T01:52:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false