Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 23, 2021, 09:11 AM
  • 02 0697_02 0696_03232021_022415.mp4

Date
03/23/2021
W/O
880456
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00311
PipeID
P03248
Time
2:11 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8649
Sewer Name
02 WOODRUFF AVENUE TRUNK
City
DOWNEY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
30
Purpose
Routine Assessment
Project
WO_880456_TV02426_MAR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
18 in.
Upstream MH
02 0696
Downstream MH
02 0697
Dir. of Survey
Upstream
Length Surveyed
348.7 ft.
Total Length
348.7 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
345
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
349
Pipe schematic from manhole 02 0696 to 02 0697
MH: 02 0696MH: 02 0697upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 06972.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish43.7 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"164.2 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"316.8 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"346.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start346.6 ft. MGO - General Observation - MAG COAT346.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start348.7 ft. MWM - Water Mark, 35 %of cross sectional area348.7 ft. AMH - Downstream Manhole, Survey Begins - 02 0696348.7 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (6)

  • General Observation - MAG COAT

    2.1 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"

    31.9 ft. - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"

    184.5 ft. - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"

    305 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 8"

Observations (12)

DistanceCodeObservation
345.8SSS
184.5TBC
0MWM
2.1MGOMAG COAT
345.8SAP
31.9TBC
2.1SSS
348.7AMH02 0697
0AMH02 0696
0MWL
2.2SAP
305TBA

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-03-23T02:11:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false