18 0417_18 0416_03162021_002808.mp4
2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.5 ft. - General Observation - MAG COAT
2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
56.5 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
119.5 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
185.2 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"
281.3 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
| Distance | Code | Observation |
|---|---|---|
| 56.5 | TB | — |
| 185.2 | TB | — |
| 0 | MWM | — |
| 2.5 | SAP | — |
| 0 | AMH | 18 0417 |
| 2.5 | MGO | MAG COAT |
| 324.7 | SSS | — |
| 0 | MWL | — |
| 327.8 | AMH | 18 0416 |
| 324 | DSZ | POSSIBLE DEPOSITS |
| 5 | DSZ | POSSIBLE DEBRIS |
| 2.5 | SSS | — |
| 324.7 | SAP | — |
| 119.5 | TB | — |
| 327.8 | MGO | CONNECTION AT MH 9 O'CLOCK CAPPED |
| 281.3 | TB | — |