Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 16, 2021, 07:47 AM
  • 18 0415_18 0414_03162021_010211.mp4

Date
03/16/2021
W/O
880300
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00699
PipeID
P14250
Time
12:47 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8638
Sewer Name
18 SANTA FE STREET RELIEF TRUNK
City
S. WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_880300_TV18173_MAR2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0415
Downstream MH
18 0414
Dir. of Survey
Downstream
Length Surveyed
248.1 ft.
Total Length
248.1 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
245
O&M Index
2
O&M Quick
2I00
O&M Rating
96
Overall Index
2
Overall Quick
Overall Rating
341
Pipe schematic from manhole 18 0415 to 18 0414
MH: 18 0415MH: 18 0414downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 04150 ft. MWM - Water Mark, 35 %of cross sectional area2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - MAG COAT5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE DEBRIS245 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - POSSIBLE DEBRIS246.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish246.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish248.1 ft. AMH - Downstream Manhole, Survey Ends - 18 0414

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.6 ft. - General Observation - MAG COAT

Observations (11)

DistanceCodeObservation
246.3SAP
2.6SAP
0MWL
248.1AMH18 0414
2.6SSS
0AMH18 0415
245DSZPOSSIBLE DEBRIS
2.6MGOMAG COAT
0MWM
5DSZPOSSIBLE DEBRIS
246.3SSS

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-03-16T00:47:55-07:00
documentation
PRO PIPE
is_lateral_inspection
false