18 0919_18 0399_03172021_004419.mp4
9 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"
10.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
10.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
89.4 ft. - Roots Medium Lateral, from 04 to 08 o'clock, 10 %, within 8 inches of joint: YES
89.4 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"
90.4 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"
90.5 ft. - Roots Medium Lateral, from 04 to 08 o'clock, 30 %, within 8 inches of joint: YES
189.9 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"
191.5 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"
202.3 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 8"
298.2 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 8"
| Distance | Code | Observation |
|---|---|---|
| 90.5 | RML | — |
| 90.4 | TB | — |
| 0 | MWM | — |
| 151 | TF | — |
| 329.4 | SSS | — |
| 191.5 | TB | — |
| 331 | AMH | 18 0399 |
| 0 | MWL | — |
| 10.2 | SAP | — |
| 298.2 | TB | — |
| 329.4 | SAP | — |
| 89.4 | RML | — |
| 9 | TB | — |
| 189.9 | TB | — |
| 202.3 | TB | — |
| 0 | AMH | 18 0919 |
| 10.2 | SSS | — |
| 89.4 | TB | — |