Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2021, 10:52 AM
  • C 0560_C 0559_03112021_041030.mp4

Date
03/11/2021
W/O
880633
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00362
PipeID
P04744
Time
2:52 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8659
Sewer Name
C JOINT OUTFALL C - UNIT 4D
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
12
Purpose
Routine Assessment
Project
WO_880633_TV03080_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Width
15 in.
Upstream MH
C 0560
Downstream MH
C 0559
Dir. of Survey
Downstream
Length Surveyed
390.8 ft.
Total Length
390.8 ft.
Structural Index
2
Structural Quick
3124
Structural Rating
11
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
15
Pipe schematic from manhole C 0560 to C 0559
MH: C 0560MH: C 0559downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 05600 ft. MWL - Water Level, 20 %of cross sectional area2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.5 ft. CS - Crack Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES2.5 ft. MGO - General Observation - STAINING36.8 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start144.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES201 ft. CS - Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES336.5 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES338 ft. CS - Crack Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES, Start367.3 ft. CS - Crack Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES, Finish388.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish388.6 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish390.8 ft. AMH - Downstream Manhole, Survey Ends - C 0559

Observation photos (5)

  • Crack Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES

    2.5 ft. - Crack Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    144.5 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES

    201 ft. - Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

    336.5 ft. - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES, Start

    338 ft. - Crack Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
338CS
2.5DAGS
0MGOCONNECTION AT MH 9 O'CLOCK
2.5CS
0MWM
0AMHC 0560
144.5CL
388.6DAGS
0MWL
388.6DSC
367.3CS
36.8DSC
336.5CM
390.8AMHC 0559
201CS
2.5MGOSTAINING

Properties (7)

additional_info
630138031021231
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2021-03-11T02:52:27-08:00
documentation
PROPIPE
is_lateral_inspection
false