Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 4, 2021, 10:41 AM
  • D 0162_D 0161_03042021_035645.mp4

Date
03/04/2021
W/O
880632
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00157
PipeID
P10038
Time
2:41 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8495
Sewer Name
D JOINT OUTFALL D - UNIT 6 RELIEF
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_880632_TV05173_MAR2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
27 in.
Upstream MH
D 0162
Downstream MH
D 0161
Dir. of Survey
Downstream
Length Surveyed
347.7 ft.
Total Length
347.7 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
201
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
201
Pipe schematic from manhole D 0162 to D 0161
MH: D 0162MH: D 0161downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - D 01629.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start343.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish347.7 ft. AMH - Downstream Manhole, Survey Ends - D 0161347.7 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK CAPPED347.7 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
347.7AMHD 0161
0MWM
343.6SAP
0MWL
0MGOCONNECTION AT THE MH 9 OC'LOCK
347.7MGOCONNECTION AT THE MH 3 OC'LOCK CAPPED
0AMHD 0162
9.5SAP
347.7MGOCONNECTION AT THE MH 9 OC'LOCK

Properties (8)

additional_info
630074030321202
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-03-04T02:41:15-08:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
29986