Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 9, 2021, 07:38 AM
  • 21 0995_21 0994_03092021_005355.mp4

Date
03/08/2021
W/O
880265
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00784
PipeID
P16095
Time
11:38 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8629
Sewer Name
21 SAN ANTONIO TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_880265_TV21055_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
21 0995
Downstream MH
21 0994
Dir. of Survey
Downstream
Length Surveyed
335.3 ft.
Total Length
335.3 ft.
Structural Index
4
Structural Quick
514L
Structural Rating
273
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
3
Overall Quick
Overall Rating
405
Pipe schematic from manhole 21 0995 to 21 0994
MH: 21 0995MH: 21 0994downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 21 09950 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start9.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"11 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES58.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8" - OPEN84.3 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"126.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8" - OPEN217.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"249.5 ft. B - Broken, from 02 to 04 o'clock, within 8 inches of joint: YES333.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish333.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335 ft. MGO - General Observation - ROACHES @ MH335.3 ft. AMH - Downstream Manhole, Survey Ends - 21 0994

Observation photos (5)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    11 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"

    84.3 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"

  • Broken, from 02 to 04 o'clock, within 8 inches of joint: YES

    249.5 ft. - Broken, from 02 to 04 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
335MGOROACHES @ MH
333.3DAGS
217.4TFC
335.3AMH21 0994
0MWL
0AMH21 0995
333.3FM
2FM
249.5B
2.1DAGS
0MWM
126.8TFOPEN
11FM
9.2TFC
58.4TFOPEN
84.3TBA

Properties (6)

custom_field_three
FRACTURES
custom_field_two
3
customer
1
datetime
2021-03-08T23:38:20-08:00
documentation
PRO PIPE
is_lateral_inspection
false