Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 10, 2021, 05:19 AM
  • 05 1095_05 1094_03092021_224229.mp4

Date
03/09/2021
W/O
880269
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00488
PipeID
P06329
Time
9:19 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8498
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 1
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_880269_TV05328_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
15 in.
Upstream MH
05 1095
Downstream MH
05 1094
Dir. of Survey
Downstream
Length Surveyed
319.1 ft.
Total Length
319.1 ft.
Structural Index
3
Structural Quick
3K22
Structural Rating
184
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
190
Pipe schematic from manhole 05 1095 to 05 1094
MH: 05 1095MH: 05 1094downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 10950 ft. MWL - Water Level, 45 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. CS - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES17.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES45.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"56.6 ft. FC - Fracture Circumferential, from 07 to 09 o'clock, within 8 inches of joint: YES144.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES145.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"189.3 ft. FS - Fracture Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES241.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"318.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319.1 ft. AMH - Downstream Manhole, Survey Ends - 05 1094

Observation photos (5)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

    3.1 ft. - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    17.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Circumferential, from 07 to 09 o'clock, within 8 inches of joint: YES

    56.6 ft. - Fracture Circumferential, from 07 to 09 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES

    189.3 ft. - Fracture Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
2CM
0MWM
319.1AMH05 1094
189.3FS
56.6FC
145.8TF
318.9CM
17.2CM
3.1CS
241.9TFC
144.3DAGS
0AMH05 1095
45.8TFC
0MWL

Properties (7)

additional_info
630074030921201
custom_field_three
CRACKS AND FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-03-09T21:19:15-08:00
documentation
PROPIPE
is_lateral_inspection
false