Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 10, 2021, 05:56 AM
  • 05 1093_05 1092_03092021_230938.mp4

Date
03/09/2021
W/O
880269
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00488
PipeID
P06327
Time
9:56 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8498
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 1
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_880269_TV05328_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
15 in.
Upstream MH
05 1093
Downstream MH
05 1092
Dir. of Survey
Downstream
Length Surveyed
317.9 ft.
Total Length
317.9 ft.
Structural Index
3
Structural Quick
413X
Structural Rating
505
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
507
Pipe schematic from manhole 05 1093 to 05 1092
MH: 05 1093MH: 05 1092downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 10930 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES4.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"6.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start101.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN203.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"314.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES315 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish315 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317.9 ft. AMH - Downstream Manhole, Survey Ends - 05 1092317.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE317.9 ft. MGO - General Observation - CONN@ MH 9 O'CLOCK/ACTIVE

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    314.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
2SSS
0AMH05 1093
317.9CM
4DAGS
203.6TFA
317.9AMH05 1092
314.8FM
317.9MGOCONN @ MH 3 O'CLOCK/ACTIVE
315SSS
2CM
6.8CM
315CM
0MWL
101.6TFOPEN
4.9TFA
317.9MGOCONN@ MH 9 O'CLOCK/ACTIVE
0MWM

Properties (7)

additional_info
630074030921201
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-03-09T21:56:24-08:00
documentation
PROPIPE
is_lateral_inspection
false