Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 9, 2021, 05:53 AM
  • 05 1604_05 1603_03082021_230616.mp4

Date
03/08/2021
W/O
880272
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00551
PipeID
P06828
Time
9:53 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8496
Sewer Name
05 203RD STREET TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
27
Purpose
Routine Assessment
Project
RFIR_WO_880272_TV05176_MAR2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
15 in.
Upstream MH
05 1604
Downstream MH
05 1603
Dir. of Survey
Downstream
Length Surveyed
292.1 ft.
Total Length
292.1 ft.
Structural Index
3
Structural Quick
4V2K
Structural Rating
580
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
3
Overall Quick
Overall Rating
698
Pipe schematic from manhole 05 1604 to 05 1603
MH: 05 1604MH: 05 1603downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 16040 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 5 %of cross sectional area2 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. CH2 - Crack Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start16 ft. CH2 - Crack Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish16 ft. FH2 - Fracture Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES, Start20.2 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN56.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN84 ft. FH2 - Fracture Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish84 ft. CH2 - Crack Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES, Start108.4 ft. TBI - Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: NO, 6", 1" - ACTIVE267.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN290 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish290 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish290 ft. CH2 - Crack Longitudinal Hinge, 2, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish292 ft. MGO - General Observation - ROACHES @ MH292.1 ft. AMH - Downstream Manhole, Survey Ends - 05 1603292.1 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    20.2 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: NO, 6", 1" - ACTIVE

    108.4 ft. - Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: NO, 6", 1" - ACTIVE

Observations (21)

DistanceCodeObservation
292MGOROACHES @ MH
2FM
16CH2
16FH2
0AMH05 1604
56.8TFOPEN
2CH2
108.4TBIACTIVE
290SSS
290DAGS
84FH2
2SSS
292.1AMH05 1603
0MWL
0MWM
84CH2
290CH2
267.6TFOPEN
20.2TBOPEN
292.1FM
2DAGS

Properties (7)

additional_info
630074030821201
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-03-08T21:53:33-08:00
documentation
PROPIPE
is_lateral_inspection
false