Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 24, 2021, 05:36 AM
  • A 0200B_A 0200A_02232021_214630.mp4

Date
02/23/2021
W/O
875111
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00323
PipeID
P08136
Time
9:36 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8488
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
SOUTH GATE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_875111_TV30023_FEB2021
Sewer Type
Siphon
Material
Reinforced Concrete Pipe
Shape
Circular
Height
78 in.
Width
39 in.
Upstream MH
A 0200A
Downstream MH
A 0200B
Dir. of Survey
Upstream
Length Surveyed
20.2 ft.
Total Length
20.2 ft.
Structural Index
3
Structural Quick
3523
Structural Rating
21
O&M Index
3
O&M Quick
4123
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
31
Pipe schematic from manhole A 0200A to A 0200B
MH: A 0200AMH: A 0200Bupstream0 ft. MSA - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON0.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.2 ft. LU - Alignment Up, 45 %0.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish18 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start18 ft. MGO - General Observation - 45% MAG COAT18.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start18.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start20.2 ft. MWM - Water Mark, 100 %of cross sectional area20.2 ft. MWL - Water Level, 100 %of cross sectional area20.2 ft. AMH - Downstream Manhole, Survey Begins - A 0200A

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    20 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON

    20.2 ft. - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON

Observations (13)

DistanceCodeObservation
20SAV
0MWM
2.2SAV
20LU
18DAGS
0MWL
20SAP
20.2MSAVIEW OF UPLEG OF D/S SIPHON
2SSS
18SSS
2.2MGO45% MAG COAT
2DAGS
0AMHA 0200A

Properties (8)

additional_info
630074022321201
custom_field_three
AGGREGATE PROJECTING
custom_field_two
5
customer
1
datetime
2021-02-23T21:36:49-08:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
27983