Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 25, 2021, 09:15 PM
  • A 0153_A 1282_02252021_133811.mp4

Date
02/25/2021
W/O
875111
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00323
PipeID
P26282
Time
1:15 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7844
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
BELLFLOWER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_875111_TV30023_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
78 in.
Width
78 in.
Upstream MH
A 0153
Downstream MH
A 1282
Dir. of Survey
Downstream
Length Surveyed
305.7 ft.
Total Length
305.7 ft.
Structural Index
3
Structural Quick
523K
Structural Rating
190
O&M Index
2
O&M Quick
2V1B
O&M Rating
243
Overall Index
2
Overall Quick
Overall Rating
433
Pipe schematic from manhole A 0153 to A 1282
MH: A 0153MH: A 1282downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 01530 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.1 ft. MGO - General Observation - 70% MAG COATING13.5 ft. LR - Alignment Right, 10 %, Start27.1 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start27.1 ft. LR - Alignment Right, 10 %, Finish254.8 ft. LR - Alignment Right, 10 %, Start296 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start302.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish302.5 ft. LR - Alignment Right, 10 %, Finish302.5 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish303 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish303 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish305.7 ft. AMH - Downstream Manhole, Survey Ends - A 1282

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Right, 10 %, Start

    13.5 ft. - Alignment Right, 10 %, Start

  • Alignment Right, 10 %, Start

    254.8 ft. - Alignment Right, 10 %, Start

Observations (17)

DistanceCodeObservation
0MWM
303DAGS
0AMHA 0153
305.7AMHA 1282
2SAP
0MWL
302.5SAP
302.5LR
27.1DSC
302.5DSC
7.1MGO70% MAG COATING
13.5LR
2DAGS
254.8LR
296SRV
303SRV
27.1LR

Properties (8)

additional_info
630075022521062
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-02-25T13:15:29-08:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
40793