Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 26, 2021, 07:47 AM
  • A 0160_A 0159_02252021_235122.mp4

Date
02/25/2021
W/O
875111
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00323
PipeID
P08097
Time
11:47 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8491
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
BELLFLOWER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_875111_TV30023_FEB2021
Sewer Type
Siphon
Material
Reinforced Concrete Pipe
Shape
Circular
Height
78 in.
Width
42 in.
Upstream MH
A 0160
Downstream MH
A 0159
Dir. of Survey
Downstream
Length Surveyed
20.2 ft.
Total Length
20.2 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
4
O&M Quick
4131
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole A 0160 to A 0159
MH: A 0160MH: A 0159downstream0 ft. MGO - General Observation - CIPP PIPE0 ft. MWL - Water Level, 100 %of cross sectional area0 ft. MWM - Water Mark, 100 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 01602 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: NO20 ft. LU - Alignment Up, 45 %20.2 ft. MSA - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: NO

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: NO

  • Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON

    20.2 ft. - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON

Observations (7)

DistanceCodeObservation
20LU
0MGOCIPP PIPE
0MWL
2DAGS
0MWM
20.2MSAVIEW OF UPLEG OF D/S SIPHON
0AMHA 0160

Properties (9)

additional_info
630074022521201
custom_field_three
NO SEVERE DEFECTS
custom_field_two
5
customer
1
datetime
2021-02-25T23:47:47-08:00
documentation
PROPIPE
is_lateral_inspection
false
lining
CIPP
year_laid
40483