Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 17, 2021, 08:24 AM
  • A 0435_A 0434_02172021_003248.mp4

Date
02/17/2021
W/O
875111
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00323
PipeID
P08157
Time
12:24 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8486
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
SOUTH GATE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_875111_TV30023_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Width
39 in.
Upstream MH
A 0435
Downstream MH
A 0434
Dir. of Survey
Downstream
Length Surveyed
265 ft.
Total Length
265 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
2
O&M Quick
2I00
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
364
Pipe schematic from manhole A 0435 to A 0434
MH: A 0435MH: A 0434downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 04350 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.4 ft. MGO - General Observation - 55% MAG COAT263 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish263 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish264.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish265 ft. AMH - Downstream Manhole, Survey Ends - A 0434

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
3.4MGO55% MAG COAT
2SAP
2DAGS
2SSS
0AMHA 0435
263SSS
264.5SAP
0MWM
263DAGS
265AMHA 0434
0MWL

Properties (7)

additional_info
630074021621202
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-02-17T00:24:55-08:00
documentation
PROPIPE
is_lateral_inspection
false