Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2021, 12:46 PM
  • H 0617_H 0887_03012021_045436.mp4

Date
03/01/2021
W/O
875032
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00191
PipeID
P22216
Time
4:46 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8623
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_875032_TV15175_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0617
Downstream MH
H 0887
Dir. of Survey
Downstream
Length Surveyed
71.2 ft.
Total Length
71.2 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
70
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
70
Pipe schematic from manhole H 0617 to H 0887
MH: H 0617MH: H 0887downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06170 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2.6 ft. MGO - General Observation - MAG COAT2.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start25.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"39.8 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 10"71.2 ft. AMH - Downstream Manhole, Survey Ends - H 088771.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish71.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • General Observation - MAG COAT

    2.6 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 10"

    39.8 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 10"

Observations (11)

DistanceCodeObservation
71.2AMHH 0887
0AMHH 0617
0MWM
71.2SAP
0MWL
2.6MGOMAG COAT
25.3TFC
2.7SSS
71.2SSS
39.8TBA
2.7SAP

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-03-01T04:46:05-08:00
documentation
PRO PIPE
is_lateral_inspection
false