Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 26, 2021, 08:07 AM
  • H 0623_H 0622A_02262021_004438.mp4

Date
02/26/2021
W/O
875032
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00191
PipeID
P21194
Time
12:07 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8621
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_875032_TV15175_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0623
Downstream MH
H 0622A
Dir. of Survey
Downstream
Length Surveyed
463.8 ft.
Total Length
463.8 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 0623 to H 0622A
MH: H 0623MH: H 0622Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06230 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2.6 ft. MGO - General Observation - MAG COAT2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"45.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"68.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 8"92.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"115.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"138.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"202.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"249.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"272.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 8"296.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"319.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"343.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"391.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"463.8 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK463.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish463.8 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK463.8 ft. AMH - Downstream Manhole, Survey Ends - H 0622A463.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • General Observation - MAG COAT

    2.6 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
0AMHH 0623
463.8MGOCONNECTION AT MH 9 O'CLOCK
0MWM
2.6MGOMAG COAT
92.2TF
249.4TFC
2.6SAP
463.8SSS
463.8MGOCONNECTION AT MH 9 O'CLOCK
463.8AMHH 0622A
343.5TFC
319.5TFC
68.2TFC
296.4TF
21TFC
391.2TFC
2.6SSS
45.2TFC
202.1TFC
463.8SAP
115.4TFC
138.9TFC
272.3TFA
0MWL

Properties (5)

custom_field_two
3
customer
1
datetime
2021-02-26T00:07:31-08:00
documentation
PRO PIPE
is_lateral_inspection
false