Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 26, 2021, 06:40 AM
  • H 0620_H 0619A_02252021_230746.mp4

Date
02/25/2021
W/O
875032
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00191
PipeID
P21164
Time
10:40 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8621
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_875032_TV15175_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0620
Downstream MH
H 0619A
Dir. of Survey
Downstream
Length Surveyed
302.1 ft.
Total Length
302.2 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
304
Pipe schematic from manhole H 0620 to H 0619A
MH: H 0620MH: H 0619Adownstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06200 ft. MWL - Water Level, 35 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start179.3 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"225.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"249.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"297 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"302.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish302.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK302.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish302.2 ft. AMH - Downstream Manhole, Survey Ends - H 0619A

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

    179.3 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

Observations (14)

DistanceCodeObservation
297TFC
2MGOMAG COAT
302.2SAP
2SSS
249.3TFC
2SAP
302.2MGOCONNECTION AT MH 9 O'CLOCK
225.3TFC
179.3TB
302.2SSS
0MWM
0AMHH 0620
302.2AMHH 0619A
0MWL

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-25T22:40:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false