Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2021, 11:17 AM
  • H 0604_H 0619_03012021_032338.mp4

Date
03/01/2021
W/O
875032
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00191
PipeID
P11038
Time
3:17 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8623
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_875032_TV15175_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0604
Downstream MH
H 0619
Dir. of Survey
Downstream
Length Surveyed
49.4 ft.
Total Length
49.4 ft.
Structural Index
3
Structural Quick
3929
Structural Rating
45
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
45
Pipe schematic from manhole H 0604 to H 0619
MH: H 0604MH: H 0619downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06040 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish48 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish49.4 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK49.4 ft. AMH - Downstream Manhole, Survey Ends - H 0619

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWL
47.9SSS
2SAP
49.4MGOCONNECTION AT MH, 3 O'CLOCK
49.4AMHH 0619
2MGOMAG COAT
2SSS
0AMHH 0604
48SAP
0MWM

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-03-01T03:17:36-08:00
documentation
PRO PIPE
is_lateral_inspection
false