H 0619_H 0618_03012021_033648.mp4
2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.6 ft. - General Observation - MAG COAT
2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
69 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 10"
116.7 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 10"
213.3 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 10"
326.5 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 477.8 | AMH | H 0618 |
| 326.5 | TB | — |
| 2.6 | SAP | — |
| 0 | AMH | H 0619 |
| 116.7 | TBA | — |
| 294.3 | TF | — |
| 2.6 | MGO | MAG COAT |
| 0 | MWM | — |
| 2.6 | SSS | — |
| 213.3 | TBA | — |
| 69 | TBA | — |
| 477.8 | SSS | — |
| 141.2 | TFC | — |
| 477.8 | SAP | — |
| 0 | MGO | CONNECTION AT MH, 3 O'CLOCK |