Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2021, 10:52 AM
  • H 0618_H 0617_03012021_044554.mp4

Date
03/01/2021
W/O
875032
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00191
PipeID
P11036
Time
2:52 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8623
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_875032_TV15175_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0618
Downstream MH
H 0617
Dir. of Survey
Downstream
Length Surveyed
475 ft.
Total Length
475 ft.
Structural Index
3
Structural Quick
3R2R
Structural Rating
470
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
470
Pipe schematic from manhole H 0618 to H 0617
MH: H 0618MH: H 0617downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06180 ft. MWL - Water Level, 20 %of cross sectional area2.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.8 ft. MGO - General Observation - MAG COAT79.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"128.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"151.6 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"329.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"363.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"388 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"459.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"471.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish473.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish475 ft. AMH - Downstream Manhole, Survey Ends - H 0617

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.8 ft. - General Observation - MAG COAT

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    151.6 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    363.7 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"

Observations (16)

DistanceCodeObservation
388TFC
0MWM
151.6TBA
329.7TFC
475AMHH 0617
2.8SSS
0AMHH 0618
471.1SSS
0MWL
363.7TBA
2.8SAP
128.5TFC
79.5TFC
473.2SAP
2.8MGOMAG COAT
459.9TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-03-01T02:52:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false