H 0616_H 0615_03012021_235314.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
52.5 ft. - Tap Break-In Intruding, at 11 o'clock, -, -, within 8 inches of joint: YES, 10", 4"
71.5 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
275.2 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"
275.9 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 15"
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | H 0616 |
| 275.9 | TBA | — |
| 0 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 295.5 | SSS | — |
| 71.5 | SRV | — |
| 52.5 | TBI | — |
| 2 | SAP | — |
| 0 | MWM | — |
| 296.9 | AMH | H 0615 |
| 275.2 | TB | — |
| 2 | SSS | — |
| 94.8 | TFC | — |
| 2 | SRV | — |
| 295.5 | SAP | — |
| 71.5 | TB | — |
| 0 | MWL | — |