Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2021, 10:47 AM
  • H 0614_H 0549_03032021_030628.mp4

Date
03/03/2021
W/O
875032
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00191
PipeID
P11032
Time
2:47 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8628
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_875032_TV15175_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0614
Downstream MH
H 0549
Dir. of Survey
Downstream
Length Surveyed
326.4 ft.
Total Length
326.4 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole H 0614 to H 0549
MH: H 0614MH: H 0549downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06140 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 10"20.6 ft. MGO - General Observation - MAG COAT21.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"53.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"69.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"100.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"117.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"132.8 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start156.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"203.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"219.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"250.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"273.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"324 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish324 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish326.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK326.4 ft. AMH - Downstream Manhole, Survey Ends - H 0549

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 10"

    11.5 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 10"

  • General Observation - MAG COAT

    20.6 ft. - General Observation - MAG COAT

  • Deposits Settled Compacted,  5 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    132.8 ft. - Deposits Settled Compacted, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
117.3TFC
0MWL
0AMHH 0614
324DSC
0MWM
250.7TFC
53.7TFC
324SSS
326.4MGOCONNECTION AT MH 3 O'CLOCK
132.8DSC
219.7TFC
203.6TFC
20.6MGOMAG COAT
2SSS
11.5TFA
69.4TFC
100.4TFC
156.4TFC
273.8TFC
21.5TFC
326.4AMHH 0549

Properties (6)

custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-03-03T02:47:14-08:00
documentation
PRO PIPE
is_lateral_inspection
false