Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 19, 2021, 11:25 AM
  • 29 0192_29 0191_02192021_034024.mp4

Date
02/19/2021
W/O
875678
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01025
PipeID
P24089
Time
3:25 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8612
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
RFIR_WO_875678_TV29101_FEB2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0192
Downstream MH
29 0191
Dir. of Survey
Downstream
Length Surveyed
256.3 ft.
Total Length
256.3 ft.
Structural Index
3
Structural Quick
413I
Structural Rating
153
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
153
Pipe schematic from manhole 29 0192 to 29 0191
MH: 29 0192MH: 29 0191downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 01920 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES7.1 ft. CS - Crack Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES9.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start52.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"54.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"58.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"102.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"109 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"136.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"154.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"158 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"206.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"210.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"243.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"246.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"254.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256.3 ft. AMH - Downstream Manhole, Survey Ends - 29 0191

Observation photos (4)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES

    7.1 ft. - Crack Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

    52.8 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

Observations (20)

DistanceCodeObservation
0AMH29 0192
136.2TF
210.1TFC
7.1CS
158TFC
9.7CM
52.8TB
4FM
254.3CM
109TFC
0MWM
102.4TFC
58.9TFC
154.5TFC
54.9TFC
206.4TF
243.4TF
246.7TF
0MWL
256.3AMH29 0191

Properties (6)

custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2021-02-19T03:25:11-08:00
documentation
PRO PIPE
is_lateral_inspection
false