Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 19, 2021, 11:41 AM
  • 29 0191_29 0190_02192021_035710.mp4

Date
02/19/2021
W/O
875678
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01025
PipeID
P24088
Time
3:41 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8612
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
RFIR_WO_875678_TV29101_FEB2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0191
Downstream MH
29 0190
Dir. of Survey
Downstream
Length Surveyed
285.5 ft.
Total Length
285.5 ft.
Structural Index
3
Structural Quick
3H23
Structural Rating
144
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
144
Pipe schematic from manhole 29 0191 to 29 0190
MH: 29 0191MH: 29 0190downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 019113.7 ft. CS - Crack Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES20 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES32.5 ft. CS - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES48.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"50.9 ft. CS - Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES51.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"56.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start76.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"98.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"101.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"150.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"153.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"199.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"202.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"214.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"255.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"284.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.5 ft. AMH - Downstream Manhole, Survey Ends - 29 0190

Observation photos (5)

  • Crack Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

    13.7 ft. - Crack Spiral, from 03 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    20 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

    32.5 ft. - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

    50.9 ft. - Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    56.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
20CM
0MWM
214.6TF
202.7TFC
285.5AMH29 0190
51.8TF
0MWL
199.8TF
284.2CM
13.7CS
98.2TFC
101.5TF
50.9CS
32.5CS
76.6TFC
150.4TF
0AMH29 0191
56.9CM
153.1TF
48.6TFC
255.7TFC

Properties (6)

custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2021-02-19T03:41:02-08:00
documentation
PRO PIPE
is_lateral_inspection
false