Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 26, 2021, 10:52 AM
  • F 0230_F 0229_02262021_030210.mp4

Date
02/26/2021
W/O
875064
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00051
PipeID
P10360
Time
2:52 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8622
Sewer Name
F JOINT OUTFALL F - UNIT 7J
City
LA MIRADA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_875064_TV18079_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
63 in.
Upstream MH
F 0230
Downstream MH
F 0229
Dir. of Survey
Downstream
Length Surveyed
161.8 ft.
Total Length
161.8 ft.
Structural Index
2
Structural Quick
392E
Structural Rating
89
O&M Index
2
O&M Quick
2E00
O&M Rating
62
Overall Index
2
Overall Quick
Overall Rating
151
Pipe schematic from manhole F 0230 to F 0229
MH: F 0230MH: F 0229downstream0 ft. AMH - Upstream Manhole, Survey Begins - F 02300 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start15.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start61.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish158.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish159 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish161.8 ft. AMH - Downstream Manhole, Survey Ends - F 0229

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    15.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0AMHF 0230
2SSS
0MWM
0MWL
2MGO65% MAG COAT
2DAGS
159DAGS
161.8AMHF 0229
15.8SAP
158.4SSS
61.7SAP

Properties (6)

custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-02-26T02:52:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false