Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 26, 2021, 11:15 AM
  • F 0228_F 0227_02262021_032601.mp4

Date
02/26/2021
W/O
875064
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00051
PipeID
P10358
Time
3:15 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8622
Sewer Name
F JOINT OUTFALL F - UNIT 7J
City
LA MIRADA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_875064_TV18079_FEB2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
78 in.
Upstream MH
F 0228
Downstream MH
F 0227
Dir. of Survey
Downstream
Length Surveyed
349.8 ft.
Total Length
349.8 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
345
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
483
Pipe schematic from manhole F 0228 to F 0227
MH: F 0228MH: F 0227downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 02280 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH2 ft. MGO - General Observation - 55% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start347 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish347 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish347.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish349.8 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE349.8 ft. AMH - Downstream Manhole, Survey Ends - F 0227

Observation photos (1)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
349.8MGOCONN @ MH 9 O'CLOCK/ACTIVE
347SAV
2MGO55% MAG COAT
347DAGS
0MWM
347.2SSS
0AMHF 0228
2DAGS
0MWL
2SSS
0MGOROACHES @ MH
2SAV
349.8AMHF 0227

Properties (6)

custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-02-26T03:15:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false