Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 11, 2021, 06:07 AM
  • H 1286_H 1285_02102021_222612.mp4

Date
02/10/2021
W/O
870408
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01183
PipeID
P17302
Time
10:07 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8601
Sewer Name
H JOINT OUTFALL H - UNIT 8L
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_870408_TV22154_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 1286
Downstream MH
H 1285
Dir. of Survey
Downstream
Length Surveyed
329.3 ft.
Total Length
329.3 ft.
Structural Index
2
Structural Quick
2L00
Structural Rating
130
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
130
Pipe schematic from manhole H 1286 to H 1285
MH: H 1286MH: H 1285downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12862.2 ft. MGO - General Observation - MAG COAT2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start77 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"84.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"157.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"164.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"221.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"229.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"282 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"289.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"326.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.3 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK329.3 ft. AMH - Downstream Manhole, Survey Ends - H 1285

Observation photos (3)

  • General Observation - MAG COAT

    2.2 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    289.4 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

Observations (17)

DistanceCodeObservation
289.4TB
0MWL
221.3TFC
0MGOCONNECTION AT MH, 3 O'CLOCK
2.2MGOMAG COAT
282TFC
329.3MGOCONNECTION AT MH, 3 O'CLOCK
157.1TFC
0MWM
329.3AMHH 1285
326.6SSS
84.5TFC
2.2SSS
164.7TFC
0AMHH 1286
229.5TF
77TFC

Properties (6)

custom_field_three
SPALLING, MAG COAT
custom_field_two
3
customer
1
datetime
2021-02-10T22:07:42-08:00
documentation
PRO PIPE
is_lateral_inspection
false