H 1285_H 1284_02102021_224720.mp4
4 ft. - General Observation - MAG COAT
4.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
50.5 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES
65.5 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
125.5 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
181.2 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
229.4 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
| Distance | Code | Observation |
|---|---|---|
| 277.9 | TFC | — |
| 4.2 | SSS | — |
| 116.9 | TFC | — |
| 0 | AMH | H 1285 |
| 221.7 | TFC | — |
| 125.5 | TB | — |
| 229.4 | TB | — |
| 285.9 | TFC | — |
| 0 | MWM | — |
| 181.2 | TB | — |
| 0 | MWL | — |
| 317.5 | AMH | H 1284 |
| 12 | TFC | — |
| 314.8 | SSS | — |
| 4 | MGO | MAG COAT |
| 173.5 | TFC | — |
| 50.5 | SRV | — |
| 60.6 | TFC | — |
| 65.5 | TB | — |
| 68.9 | TFC | — |
| 0 | MGO | CONNECTION AT MH, 3 O'CLOCK |