Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2021, 06:09 AM
  • 02 1086_02 1085_01282021_222225.mp4

Date
01/28/2021
W/O
870244
Weather
Heavy Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00282
PipeID
P03660
Time
10:09 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8444
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_870244_TV02212_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
24 in.
Upstream MH
02 1086
Downstream MH
02 1085
Dir. of Survey
Downstream
Length Surveyed
315.5 ft.
Total Length
315.5 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
310
Pipe schematic from manhole 02 1086 to 02 1085
MH: 02 1086MH: 02 1085downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 10860 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area5.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start25.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"37.8 ft. MGO - General Observation - MAG COATING THROUGHOUT73.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"121.8 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"277.2 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"314.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish314.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish315.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1085

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    37.8 ft. - General Observation - MAG COATING THROUGHOUT

Observations (13)

DistanceCodeObservation
37.8MGOMAG COATING THROUGHOUT
314.6SSS
315.5AMH02 1085
73.8TFC
25.8TFC
121.8TBA
314.6SAP
5.3SAP
0AMH02 1086
277.2TBA
5.3SSS
0MWM
0MWL

Properties (7)

additional_info
630069012821201
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2021-01-28T22:09:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false