Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2021, 06:23 AM
  • 02 1085_02 1084_01282021_224222.mp4

Date
01/28/2021
W/O
870244
Weather
Heavy Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00282
PipeID
P03659
Time
10:23 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8444
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_870244_TV02212_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
21 in.
Upstream MH
02 1085
Downstream MH
02 1084
Dir. of Survey
Downstream
Length Surveyed
335.5 ft.
Total Length
335.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
327
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
327
Pipe schematic from manhole 02 1085 to 02 1084
MH: 02 1085MH: 02 1084downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10850 ft. MWL - Water Level, 15 %of cross sectional area3.4 ft. MGO - General Observation - MAG COATING THROUGHOUT3.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start61.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"158.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"206.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"332.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish332.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1084

Observation photos (3)

  • General Observation - MAG COATING THROUGHOUT

    3.4 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
61.6TFC
332.5SAV
335.5AMH02 1084
0MWM
0AMH02 1085
3.4MGOMAG COATING THROUGHOUT
3.4SSS
332.5SSS
206.9TFC
158.1TFC
0MWL
9.9SAV

Properties (7)

additional_info
630069012821201
custom_field_three
VISIBLE AGGREGATE/SPALLING
custom_field_two
3
customer
1
datetime
2021-01-28T22:23:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false