Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2021, 09:42 AM
  • 20 0191_20 0190_02102021_020404.mp4

Date
02/10/2021
W/O
875315
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19115
Time
1:42 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8563
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_875315_TV20060_FEB2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0191
Downstream MH
20 0190
Dir. of Survey
Downstream
Length Surveyed
487.2 ft.
Total Length
487.2 ft.
Structural Index
3
Structural Quick
3R2R
Structural Rating
485
O&M Index
2
O&M Quick
312T
O&M Rating
217
Overall Index
2
Overall Quick
Overall Rating
702
Pipe schematic from manhole 20 0191 to 20 0190
MH: 20 0191MH: 20 0190downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01910 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"85 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"88.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"137 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"186.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"189.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"235.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"238.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"287.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"336.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"339.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"385.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"388.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"437 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"437 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS440 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"486.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish486.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish486.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish486.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish486.3 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES487.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK487.2 ft. AMH - Downstream Manhole, Survey Ends - 20 0190

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES

    486.3 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES

Observations (31)

DistanceCodeObservation
487.2MGOCONNECTION AT MH 3 O'CLOCK
238.2TFC
486.3SAP
486.3DSZ
437TFC
0AMH20 0191
2DAGS
133.4TFC
2SAP
440TFC
287.4TFC
88.2TFC
486.3DAGS
137TFC
437DSZDEBRIS
189.2TFC
0MGOCONNECTION AT MH 3 O'CLOCK
487.2AMH20 0190
385.1TFC
336.4TFC
186.4TFC
2SSS
486.3SSS
0MWM
339.8TFC
0MWL
85TFC
32.7TFC
388.2TFC
235.4TFC
486.3DAGS

Properties (7)

additional_info
630069020921202
custom_field_three
SPALLING/PROJECTING AGGREGATE/DEBRIS
custom_field_two
2
customer
1
datetime
2021-02-10T01:42:09-08:00
documentation
PRO PIPE
is_lateral_inspection
false