Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 8, 2021, 02:36 PM
  • 20 0190_20 0189_02082021_065011.mp4

Date
02/08/2021
W/O
875315
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19114
Time
6:36 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8558
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_875315_TV20060_FEB2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
20 0189
Downstream MH
20 0190
Dir. of Survey
Upstream
Length Surveyed
352.1 ft.
Total Length
352.1 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
350
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
490
Pipe schematic from manhole 20 0189 to 20 0190
MH: 20 0189MH: 20 0190upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 01900 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK1.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish48.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"96.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"99.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"146.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"197.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"200.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"250 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"253.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"299.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"302.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"302.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"350.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start350.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start350.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start352.1 ft. AMH - Downstream Manhole, Survey Begins - 20 0189352.1 ft. MWL - Water Level, 20 %of cross sectional area352.1 ft. MWM - Water Mark, 35 %of cross sectional area

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
352.1AMH20 0190
0AMH20 0189
303.6TFC
49.6TFC
252.2TFC
49.6TFC
102.1TFC
2DAGS
2SAP
0MWL
350.3SAP
2SSS
154.9TFC
350.3SSS
98.6TFC
52.5TFC
300.7TFC
205.8TFC
352.1MGOCONNECTION AT MH 9 O'CLOCK
0MWM
151.2TFC
350.3DAGS
203.2TFC
255.4TFC

Properties (7)

additional_info
630069020821022
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-02-08T06:36:33-08:00
documentation
PRO PIPE
is_lateral_inspection
false